10FROM THE BLOG

Pool Demolition in Barrie: In-Ground Pool Removal Cost & Process for Simcoe County Homes

November 16, 20265 min read
Kubota excavator breaking up an in-ground concrete pool during a residential pool demolition project

An aging or unused in-ground pool can take up valuable yard space while continuing to demand maintenance, repairs and attention to safety. If you’re considering pool demolition in Barrie or elsewhere in Simcoe and Dufferin County, it helps to understand the removal options, the work involved and what affects the price. Tor Contracting’s demolition team handles pool removal and backfill as part of our residential demolition services. The photo above shows a Kubota excavator working on an...

An aging or unused in-ground pool can take up valuable yard space while continuing to demand maintenance, repairs and attention to safety. If you’re considering pool demolition in Barrie or elsewhere in Simcoe and Dufferin County, it helps to understand the removal options, the work involved and what affects the price.

Tor Contracting’s demolition team handles pool removal and backfill as part of our residential demolition services. The photo above shows a Kubota excavator working on an in-ground concrete pool at the Guy Davis job.

When does pool removal make sense?

Homeowners consider removing an in-ground pool for several reasons:

  • Ongoing costs: Chemicals, equipment, opening and closing, repairs and water use can add up.
  • The pool is rarely used: Reclaiming the space may make the yard more useful for everyday living.
  • Leaks or deterioration: Cracks, failing liners or aging equipment can turn a pool into a costly repair project.
  • Safety and liability concerns: An unused pool still needs to be secured and maintained.
  • A change in plans: A lawn, garden or patio may suit your household better.

Pool removal isn’t automatically the right choice for every property. If you’re unsure, compare the cost of necessary repairs with the longer-term upkeep and consider how you want to use the yard.

Full removal or partial removal: what’s the difference?

The right method depends on your plans for the property, the pool’s construction and local requirements. Discuss both options with a qualified contractor before deciding.

Illustrative cutaway comparing partial pool removal, with broken concrete left below grade, and full removal, with the pool shell excavated

Illustrative cutaway comparing partial pool removal, with broken concrete left below grade, and full removal, with the pool shell excavated

Illustration is conceptual; the appropriate method and site details vary by project.

Partial removal, or pool fill-in

With partial removal, the upper section of the pool shell is typically broken down, and openings are made in the remaining structure to allow drainage. The cavity is then filled and compacted. This is often called a pool fill-in or abandonment.

It can be a lower-cost choice when the area will become lawn, garden or another use that doesn’t require a new foundation. But the buried shell remains below ground. Settlement, drainage and future construction plans all matter, so ask what backfill and compaction method is included. A poorly executed fill-in can leave a low spot or unstable ground.

Full pool removal

Full removal means excavating and hauling away the pool shell and related material, then filling and grading the excavation. It generally costs more because it involves additional demolition, excavation and disposal.

Full removal may be preferable if you plan to build over the area, want the buried shell removed, or want to avoid complications associated with a partial fill-in. Any future building plans should be discussed with the contractor and, where appropriate, a qualified design professional.

How does pool demolition work?

A well-planned pool removal involves more than breaking concrete. The work needs to account for utilities, safe access, debris, fill and how water will drain from the restored yard.

  1. Site assessment and scope: The contractor reviews the pool’s size and construction, machine access, nearby structures, decking, fencing and intended use for the space.
  2. Permits and utility planning: Confirm municipal requirements and arrange utility locates before excavation begins.
  3. Safe disconnection and preparation: Pool equipment is removed or handled as agreed. Electrical, gas and plumbing connections are made safe by the appropriate qualified trades.
  4. Draining and demolition: Water is handled in accordance with applicable local requirements. The shell is broken and removed, or prepared for a partial fill-in, according to the agreed scope.
  5. Backfill and compaction: Suitable fill is placed and compacted in stages. The material and method should be appropriate for the removal type and future use.
  6. Final grading and cleanup: The work area is graded and left ready for the specified restoration, such as topsoil, sod or seed.

Tor Contracting’s demolition services include pool removal and backfill, concrete demolition, debris removal and site cleanup. Our excavating services support the site work involved in pool removal.

Permits and utility locates in Barrie

Before scheduling work, contact the City of Barrie’s demolition permit information page and ask how the proposed work is classified. Requirements may depend on whether the pool is fully removed or partly left in place, what else is being demolished, and the property’s location. The pool enclosure or fence may also need separate attention. Don’t assume that a pool fill-in is permit-free; confirm the requirements for your specific address and scope.

Before digging, arrange public utility locates through the appropriate Ontario process and allow time for responses. Dig Safe’s guidance explains the importance of requesting locates before ground disturbance. Public locates may not identify privately owned services, such as lines to a pool heater, shed, landscape lighting or irrigation. Ask your contractor whether private locates are also needed.

Electrical lines serving pumps, lights and other pool equipment should be made safe by a qualified professional. Gas lines for heaters need to be handled by a qualified gas technician. Discuss how underground plumbing and services will be disconnected, capped, removed or abandoned, and make sure those details are clear in the written scope.

Pool removal preparation showing isolated outdoor pool equipment and utility markings before excavation

Pool removal preparation showing isolated outdoor pool equipment and utility markings before excavation

Illustrative image of utility and equipment preparation; actual site conditions and services vary.

Pool removal cost in Ontario: what affects the price?

There is no single price for pool removal. As an initial budgeting reference, Southern Ontario contractor estimates researched for this article put partial in-ground pool fill-ins at roughly $6,000–$12,000, and full removals at approximately $12,000–$20,000 or more. These are broad market estimates, not a City of Barrie price list or a quote for your property. Confirm current pricing with a contractor after a site review.

Factors that can change the pool removal cost in Ontario include:

  • Pool size, depth and construction, including reinforced concrete
  • Whether you choose full or partial removal
  • Access for excavators and trucks
  • The amount of concrete decking, coping or surrounding hardscape to remove
  • Hauling and disposal requirements
  • The type and amount of fill, and the compaction required
  • Utility disconnections, private locates and permit requirements
  • Final grading and whether topsoil, sod or another finish is included

When comparing quotes, ask for an itemized scope. Check whether the price includes water handling, equipment and line disconnections, shell removal, hauling, backfill, compaction, grading and restoration. A low price may not cover the same work as a more complete quote.

Restoring the yard, and planning what comes next

Once the pool is removed or filled in, the yard can become a lawn, garden or patio. Proper grading matters: the finished surface should direct water away from the home and avoid sending runoff toward neighbouring properties. Topsoil and sod or seed can help complete a lawn, while a patio or garden can make the former pool area a usable outdoor space.

Example of a backyard with a lawn, garden beds and patio after a pool has been removed

Example of a backyard with a lawn, garden beds and patio after a pool has been removed

Illustrative landscape concept, not a Tor Contracting project photo.

If you may want to build in the former pool area later, say so before choosing a removal method. The buried shell left by a partial removal can affect future construction. A full removal may better suit some building plans, but site-specific soil and compaction requirements still need to be considered.

Is winter a good time to plan pool demolition?

Late fall and winter can be a useful time to request an assessment and plan a project for the coming season. Booking ahead gives you time to confirm permits, utility work, access and your preferred yard finish. However, winter work depends on site conditions: frost, snow, access and the ability to place and compact fill can affect scheduling and restoration. Ask your contractor whether the work is practical in the conditions at your property.

Get a pool demolition quote in Barrie

If an unused, leaking or deteriorating pool is taking up space, Tor Contracting can assess the site and discuss full removal or partial fill-in options. We serve Barrie and surrounding communities in Simcoe and Dufferin County.

Visit torcontracting.ca or call 705-481-7731 to discuss your pool demolition project and request a quote.

Back to Blog
GET A QUOTE

Ready to Start Your Project?

Request a Quote